Our projects

Our experience in completed projects is a reliable foundation for high quality and the trust of our clients.

We demonstrate our professionalism through results: successfully operating facilities that bring benefits to our clients.

New construction of a biomethane production and liquefaction plant

Installation of two sorting lines and two platform unloading machines

Restoring critical fuel production after shelling

Electrical installation and commissioning works of the exhaust system of the OSB press (scrubber) Scruber Dedusting

Installation of a workshop air cooling unit

Installation of liquefied gas storage tanks (height 22 m, weight 32 t)

Project of a covered hangar for packaging ammonium nitrate in big bags and sling bags

Project: "AdBlue Catalytic Reducer Production Unit with a Capacity of 30,000 Tons per Year"

Emergency repair work to restore the operability of the control and monitoring equipment of the LK-6U S500 plant, production No. 2

Repair of the tail gas heater UGS-1 with restoration of 100% performance

Implementation of an emergency power supply scheme using diesel generators for a shopping mall

You may be interested in